Ray Service Manual Install — Drgem X

Ray Service Manual Install — Drgem X

Connect the HV cables from the generator to the X-ray tube. Apply silicone grease to the terminals to prevent arcing.

Document all calibration values, tube serial numbers, and initial exposure baselines in the system installation logbook.

Never hand over the system to a clinical team without a final verification. drgem x ray service manual install

Gradually increase parameters to high kVp/high mAs according to the specific tube warming chart provided by DRGEM. Alignment and Calibration Tasks

Most DRGEM systems require a stable 220V or 380V AC source with a dedicated circuit breaker. Connect the HV cables from the generator to the X-ray tube

Check AC input voltage (should be 20-30VAC).

This is a critical step that requires meticulous attention to prevent corona discharges. Never hand over the system to a clinical

What type of is being installed (e.g., ceiling-suspended or floor-mounted)?

: Verify the room meets local radiation safety regulations.

: Securely bolt the floor track or ceiling rails to the architectural framework using a laser level to ensure perfect parallelism.

Connect the emergency switch, tube cover sensors, and generator interface cables. 4. Software Installation and System Calibration